This is a list of the various items that will need to be costed for both materials and labour to give you an estimate of the final cost of building your house.
If you are getting a mortgage your lender will want details of the costings for all the items listed below .
Demolition of existing dwelling (if applicable)
|
Preliminaries
|
Site clearance and Preparation
|
Substructure
|
Foundation
|
Blocklaying
|
Timberframe (if applicable)*
|
Structure
|
External Walls
|
Internal Walls
|
Brickwork
|
External Doors
|
Internal Doors
|
Windows
|
Roof Structure
|
Stairs
|
Plasterwork and Finishes
|
Internal joinery
|
Flooring and Finishes
|
Electric
|
1st Fix
|
2nd Fix
|
Plumbing
|
1st Fix
|
2nd Fix
|
Heating
|
Insulation
|
Kitchen & Utility units
|
Bathroom, sanitary ware & fittings
|
Fitted wardrobes
|
Fireplace
|
Fixtures & Fittings
|
Waste and Drainage
|
Landscaping & Driveway
|
Tarmac & Kerbing
|
10% Contingency
|
Architect/Solicitor/Professional Fees (incl. VAT)
|
Connection Fees (Water and ESB)
|
Other Fees
|
You are advised to get a qualified professional to work out the costings for you
No comments:
Post a Comment