Sunday, May 01, 2005

Inside Plastering Finished

The plasterer finished the inside of the house last Friday - so now the electrician and plumber can come back to do the next stages. The electrician had two lads in the house on Saturday - fitting all the final bits of the sockets and the phone points and TV points and switches. The plumber has promised to be here on Tuesday (Monday is a bank Holiday) - to fit the radiators and oil boiler and the water pipes. As soon as he has done that - we will be getting the floor screed laid (concrete) . We will then have to wait a couple of weeks before any floor tiles can be laid. We could begin painting upstairs and then tiling and flooring upstairs too while we are waiting for the downstairs floor to set.
The drains/sewage pipes outside will also need sorting out in the next couple of weeks.
Before the plumber comes back on Tuesday we have a bit of clearing up to to - to sweep the floors and get rid of any rubble etc - so that will be a few more blisters on these hands that have hardly being used!