Plastering was underway at full speed again today. The dormer windows have had a coat each - but need another tomorrow. The outside of the whole house and the garage have had the "scratch coat" applied now.
The interior ceilings and stud walls will be plasterboarded tomorrow and Saturday - following on close behind the electrician who is back from his trip to see Man Utd lose in Milan.
The plasterer can start inside as soon as all the plasterboard has been fixed in place - this should be Monday - we hope. I like to see something being done every day now.
We need to get going with things like the drains and sewage works outside soon. Also need to organise digging of a trench for the electricity supply.
The waste treatment plant also needs organising - I am ringing an agent from Bord Na Mona to talk about their Puraflo system tomorrow. It's basically a peat based filter system with a controlled pump from a septic tank.